The project is situated in Rantauprapat, Indonesia. The plant has one (01) digester with total volume of 9250 m3. The daily biogas generation is 23256 m3. The waste treated in this plant is Palm Oil Mill Effluent (POME). The plant was commissioned in November, 2016. The biogas is used in boiler.
The project is situated in West New Britain Province, Papua New Guinea. The plant has one (01) digester with volume of 5863 m3. The daily biogas generation is 14918 m3. The waste treated in this plant is Palm Oil Mill Effluent(POME). The plant was commissioned in May, 2014. The biogas is used in the boiler.
The project is situated in Rantau Prapat, Indonesia. The plant has one (01) digester with volume of 8495 m3. The daily biogas generation is 21548 m3. The waste treated in this plant is Palm Oil Mill Effluent (POME). The plant was commissioned in, April 2014. The biogas is used in the boiler.