The project is situated in Indonesia. The plant has one (01) digester with total volume of 8400 m3. The daily biogas generation is 17856 m3. The waste treated in this plant is POME effluent. The plant was commissioned in Sep2018 with Anaerobic tank ZPHB® CSTR process.
The process includes Pre-Treatment, Anaerobic Treatment followed by Biogas Management system. Biogas is utilized for Power generation – 2.3 MW (1.9 +0.9 MH) gas engine installed and power is used for captive.
Name: Citra Borneo Indah
Location: Indonesia
Biogas Generation: 17856 m3


