The project is situated in Rantauprapat, Indonesia. The plant has one (01) digester with total volume of 9250 m3. The daily biogas generation is 23256 m3. The waste treated in this plant is Palm Oil Mill Effluent (POME). The plant was commissioned in November, 2016. The biogas is used in boiler.

Name: PT. Tolan Tiga
Location: Rantauprapat, Indonesia.
Biogas Generation: 28341 m3/day