The project is situated in Indonesia. The plant has one (01) digester with volume of 8344 m3. The daily biogas generation is 19503 m3. The waste treated in this plant is Palm Oil Mill Effluent(POME). The plant was commissioned in February, 2014. The biogas is used in boiler.