The project is situated in Indonesia. The plant has one (01) digesters with total volume of 8400 m3. The daily biogas generation is 17856 m3. The waste treated in this plant is POME effluent. The plant was commissioned in Sep2018 with Anaerobic tank ZPHB® CSTR process.
The process includes Pre Treatment, Anaerobic Treatment followed by Biogas Management system. Biogas is utilized for Power generation - 2.3 MW (1.9 +0.9 MH) gas engine installed and power is used for captive.
The project is situated in Barranquilla, Colombia. The waste water is from the discharge of the agro-chemical industries which is highly inorganic and high TDS. KIS group has implemented the project for 2500 m3/day of waste water. Proposed ETP is based on Advanced ZCT®- OHR (Hydroxyl Radical) & ZCT®-ECR (Electro Contaminant Removal) systems with advanced Dissolved air floatation systems for sludge removal and Filter press system for sludge dewatering. The sludge cake is disposed off safely & treated effluent is discharged into river as per the local standards / regulations.