The project is situated in Kalimantan, Indonesia. The plant has one (01) digester with total volume of 6975 m3. The daily biogas generation is 20056 m3. The waste treated in this plant is Palm Oil Mill Effluent(POME). The plant was commissioned in July, 2013. The biogas is used in Biogas Burner in Boiler.