Substrate: Cow dung and potato waste.
Substrate Quantity: 40 TPD.
The Biogas Generation is 2000 m3/day with reactor volume of 3000 m3. The reactor MOC is concrete with the pump recirculation and double membrane roof. The Biogas is upgraded from 55% methane to 96% methane using PSA system. The Pressure swing absorption is a 2-stage purification process. The purified methane is stored in cascades and supplied to the dispenser unit which is installed for supply BioCNG® to the trucks / vehicles.
Below are the project photos of Banas Dairy at Palanpur :